Weapons Complex Monitor Vol. 34 No. 35
Visit Archives | Return to Issue
PDF
Weapons Complex Monitor
Article 8 of 11
September 15, 2023

WIPP won’t receive shipments during February

By ExchangeMonitor

The Department of Energy’s Waste Isolation Pilot Plant in New Mexico has told transuranic waste generators that it won’t take shipments during February 2024, the head of DOE’s prime contractor said here Wednesday.

The Waste Isolation Pilot Plant (WIPP) has traditionally held a multi-week maintenance outage during the winter and February tends to be hardest hit by weather-related delays anyway, Ken Harrawood, president of Salado Isolation Mining Contractors, said on the sidelines of DOE’s National Cleanup Workshop.

The Bechtel affiliate took over from the prior Amentum-led WIPP contractor in November 2022. 

WIPP recently expanded to three crews rather than two for waste handling, Harrawood said after participating in a panel discussion on the future of the Office of Environmental Management.

In addition, construction of the Safety Significant Confinement Ventilation System more than 80% complete and commissioning should start by the end of this year. That involves many months of testing to make sure the facilities work as designed, he added.

The new ventilation system is designed to triple underground airflow at WIPP to 540,000 cubic feet per minute, according to DOE. 

Comments are closed.

Partner Content
Social Feed

NEW: Via public records request, I’ve been able to confirm reporting today that a warrant has been issued for DOE deputy asst. secretary of spent fuel and waste disposition Sam Brinton for another luggage theft, this time at Las Vegas’s Harry Reid airport. (cc: @EMPublications)

DOE spent fuel lead Brinton accused of second luggage theft.



by @BenjaminSWeiss, confirming today's reports with warrant from Las Vegas Metro PD.

Waste has been Emplaced! 🚮

We have finally begun emplacing defense-related transuranic (TRU) waste in Panel 8 of #WIPP.

Read more about the waste emplacement here: https://wipp.energy.gov/wipp_news_20221123-2.asp

Load More