Morning Briefing - January 02, 2019
Visit Archives | Return to Issue
PDF
Morning Briefing
Article 3 of 7
January 02, 2019

Transition of MFFF to Savannah River Site Contractor Underway, NNSA Says

By ExchangeMonitor

The management and operations contractor for the Savannah River Site has finalized a plan to assume responsibility for crucial components of the canceled Mixed Oxide Fuel Fabrication Facility (MFFF): the controversial plutonium disposal plant that was, until October, to be built at the site. 

The Department of Energy’s National Nuclear Security Administration (NNSA) announced the milestone in a press release just before the Christmas holiday. The agency canceled the project after years of political and legal battles — some of which are still raging in federal courts in South Carolina and Nevada.

The MFFF, which contractor MOX Services was building at the Savannah River Site, was to turn 34 metric tons of surplus weapon-usable plutonium into commercial nuclear reactor fuel under a 2000 arms control agreement with Russia. Now that it has been terminated — after running billions of dollars over budget and being forecast to take years longer to complete than anticipated — the Fluor-led Savannah River site contractor, Savannah River Nuclear Solutions, will become the steward of the shuttered facility.

“Savannah River Nuclear Solutions transmitted the Mixed Oxide Fuel Fabrication Facility (MOX) transition plan to NNSA today for review and approval,” the NNSA’s public affairs office wrote in an unsolicited Dec. 21 statement.  “This plan is required as part of the wind down of the MOX project and it defines the timeline for transition and turnover of MOX contract facilities, equipment, materials, government property, documents, and records for future use.” 

The NNSA plans to turn the MFFF into a facility to annually produce 50 fissile warhead cores called plutonium pits by 2030. The plan is not a lock yet, as it still needs funding from Congress that cannot be secured for at least another year. Planned pit facilities at the Los Alamos National Laboratory in New Mexico are also intended to be capable of running in a “surge capacity” to cover the NNSA’s pit needs without help from a converted MFFF. The White House wants the NNSA to make a total of 80 pits a year by 2030.

Comments are closed.

Partner Content
Social Feed

NEW: Via public records request, I’ve been able to confirm reporting today that a warrant has been issued for DOE deputy asst. secretary of spent fuel and waste disposition Sam Brinton for another luggage theft, this time at Las Vegas’s Harry Reid airport. (cc: @EMPublications)

DOE spent fuel lead Brinton accused of second luggage theft.



by @BenjaminSWeiss, confirming today's reports with warrant from Las Vegas Metro PD.

Waste has been Emplaced! 🚮

We have finally begun emplacing defense-related transuranic (TRU) waste in Panel 8 of #WIPP.

Read more about the waste emplacement here: https://wipp.energy.gov/wipp_news_20221123-2.asp

Load More