Morning Briefing - April 22, 2024
Visit Archives | Return to Issue
PDF
Morning Briefing
Article 4 of 7
April 21, 2024

Top end of pit-plant acquisition north of $35B, NNSA administrator says

By ExchangeMonitor

It could cost up to $37 billion to acquire the pair of plutonium pit production facilities needed to produce new nuclear weapon cores for the rest of this century, the head of the National Nuclear Security Administration said at a conference last week.

The range, provided by Administrator Jill Hruby at the annual Strategic Weapons in the 21st Century Symposium, is $28 billion to $37 billion, according to Hruby’s prepared remarks. The Lawrence Livermore National Laboratory and the Los Alamos National Laboratory host the annual symposium, usually in Washington.

The Savannah River Plutonium Processing Facility, the larger of the two planned pit plants, could cost between $18 billion and $25 billion, the National Nuclear Security Administration (NNSA) estimated in its fiscal year 2025 budget request, released in March.

Hruby testified in Congress last week that the Savannah River facility will come online in the middle of the 2030s and initially make cores for the Navy’s planned W93 submarine-based intercontinental ballistic missile warhead.

The smaller of the two pit factories, at the Los Alamos National Laboratory’s PF-4 Plutonium Facility, will by December begin producing warheads for the Air Force’s W87-1 land-based intercontinental ballistic missile warhead.

Comments are closed.

Partner Content
Social Feed

NEW: Via public records request, I’ve been able to confirm reporting today that a warrant has been issued for DOE deputy asst. secretary of spent fuel and waste disposition Sam Brinton for another luggage theft, this time at Las Vegas’s Harry Reid airport. (cc: @EMPublications)

DOE spent fuel lead Brinton accused of second luggage theft.



by @BenjaminSWeiss, confirming today's reports with warrant from Las Vegas Metro PD.

Waste has been Emplaced! 🚮

We have finally begun emplacing defense-related transuranic (TRU) waste in Panel 8 of #WIPP.

Read more about the waste emplacement here: https://wipp.energy.gov/wipp_news_20221123-2.asp

Load More