Nuclear Security & Deterrence Monitor Vol. 23 No. 04
Visit Archives | Return to Issue
PDF
Nuclear Security & Deterrence Monitor
Article 2 of 10
January 25, 2019

NNSA Finishes Secondary Stage for First War-Ready B61-12 Bomb

By Dan Leone
The National Nuclear Security Administration said Jan. 18 it finished building the secondary stage for the first war-ready B61-12 nuclear gravity bomb on Dec. 6. The canned subassembly is the uranium-fueled stage of the future gravity bomb, which as part of a 20-year…
Thank you for visiting
Nuclear Security & Deterrence Monitor!

You must be logged in as a subscriber to view this page.

Not a subscriber? Click here to sign up for a FREE six-week trial and receive access to this article, along with our entire archives.

LOGIN

Please contact [email protected] if you are unable to login.

Comments are closed.

Partner Content
Social Feed

NEW: Via public records request, I’ve been able to confirm reporting today that a warrant has been issued for DOE deputy asst. secretary of spent fuel and waste disposition Sam Brinton for another luggage theft, this time at Las Vegas’s Harry Reid airport. (cc: @EMPublications)

DOE spent fuel lead Brinton accused of second luggage theft.



by @BenjaminSWeiss, confirming today's reports with warrant from Las Vegas Metro PD.

Waste has been Emplaced! 🚮

We have finally begun emplacing defense-related transuranic (TRU) waste in Panel 8 of #WIPP.

Read more about the waste emplacement here: https://wipp.energy.gov/wipp_news_20221123-2.asp

Load More