Weapons Complex Monitor Vol. 33 No. 13
Visit Archives | Return to Issue
PDF
Weapons Complex Monitor
Article 6 of 9
April 01, 2022

Mercury treatment plant at Oak Ridge 40% complete, DOE says

By Staff Reports
Construction of the 200 Mercury Treatment Facility at the Department of Energy’s Oak Ridge Site in Tennessee is now 40% complete, an agency spokesperson said by email Wednesday. The project includes building a treatment facility, headworks facility, and a 3,000-foot…
Thank you for visiting
Weapons Complex Monitor!

You must be logged in as a subscriber to view this page.

Not a subscriber? Click here to sign up for a FREE six-week trial and receive access to this article, along with our entire archives.

LOGIN

Please contact [email protected] if you are unable to login.

Comments are closed.

Partner Content
Social Feed

NEW: Via public records request, I’ve been able to confirm reporting today that a warrant has been issued for DOE deputy asst. secretary of spent fuel and waste disposition Sam Brinton for another luggage theft, this time at Las Vegas’s Harry Reid airport. (cc: @EMPublications)

DOE spent fuel lead Brinton accused of second luggage theft.



by @BenjaminSWeiss, confirming today's reports with warrant from Las Vegas Metro PD.

Waste has been Emplaced! 🚮

We have finally begun emplacing defense-related transuranic (TRU) waste in Panel 8 of #WIPP.

Read more about the waste emplacement here: https://wipp.energy.gov/wipp_news_20221123-2.asp

Load More