RadWaste Monitor Vol. 16 No. 37
Visit Archives | Return to Issue PDF
Visit Archives | Return to Issue PDF
RadWaste Monitor
Article 5 of 6
September 29, 2023
Holtec prepares for demolition of tanks, reactor vessel at Pilgrim; 80% of plant demolished
Holtec Decommissioning International plans this fall to demolish water tanks at the shuttered Pilgrim Nuclear Power Plant that held radioactively contaminated water and, by mid-winter, package much of the radioactive waste from the plant’s reactor vessel.
Members…
Partner Content
Jobs