Nuclear Security & Deterrence Vol. 19 No. 7
Visit Archives | Return to Issue
PDF
Nuclear Security & Deterrence Monitor
Article 11 of 15
February 13, 2015

General Dynamics Reports $1.4B Backlog in Design and Development on Ohio-Class Replacement

By Jeremy Dillon
Brian Bradley NS&D Monitor 2/13/2015 General Dynamics this week reported a $1.4 billion backlog for engineering services for design and development of the Ohio-Class Replacement submarine at the year-end of 2014, representing about 4.5 percent of total backlog…
Thank you for visiting
Nuclear Security & Deterrence Monitor!

You must be logged in as a subscriber to view this page.

Not a subscriber? Click here to sign up for a FREE six-week trial and receive access to this article, along with our entire archives.

LOGIN

Please contact [email protected] if you are unable to login.

Comments are closed.

Partner Content
Social Feed

NEW: Via public records request, I’ve been able to confirm reporting today that a warrant has been issued for DOE deputy asst. secretary of spent fuel and waste disposition Sam Brinton for another luggage theft, this time at Las Vegas’s Harry Reid airport. (cc: @EMPublications)

DOE spent fuel lead Brinton accused of second luggage theft.



by @BenjaminSWeiss, confirming today's reports with warrant from Las Vegas Metro PD.

Waste has been Emplaced! 🚮

We have finally begun emplacing defense-related transuranic (TRU) waste in Panel 8 of #WIPP.

Read more about the waste emplacement here: https://wipp.energy.gov/wipp_news_20221123-2.asp

Load More