Morning Briefing - September 23, 2019
Visit Archives | Return to Issue
PDF
Morning Briefing
Article 6 of 7
September 23, 2019

GD Electric Boat Breaks Ground on Columbia Sub Production Facility

By ExchangeMonitor

General Dynamics Electric Boat broke ground on a new 200,000-square-foot facility on Sept. 13 that will be dedicated to building the new Columbia-class ballistic missile submarine.

Called the South Yard Assembly Building (SYAB), it will be on 7 acres of the company’s property at its Groton, Conn., facility and is the largest company construction project in 45 years, GD Electric Boat President Jeffrey Geiger said.

“The facility we break ground on today will enable Electric Boat to deliver the U.S. Navy’s number-one acquisition priority—the Columbia class—our nation’s next-generation fleet of ballistic missile submarines,” Geiger said in a statement.

The company also plans to build a floating dock to launch Columbia vessels as well as expand and update other manufacturing spaces.

Geiger is scheduled to retire on Sept. 30 after 35 years with General Dynamics. He will be succeeded as president of General Dynamics Electric Boat by Kevin Graney, president of GD National Steel and Shipbuilding Co.

General Dynamics Electric Boat is contracted to build 12 Columbia-class ballistic missile submarines, which will replace the Navy’s existing fleet of 14 Ohio-class boats. The new vessels are scheduled to serve into the 2080s. They will be loaded with Trident II-D5 missiles tipped with W76 or W88 nuclear warheads built by the Department of Energy’s semiautonomous National Nuclear Security Administration.

Comments are closed.

Partner Content
Social Feed

NEW: Via public records request, I’ve been able to confirm reporting today that a warrant has been issued for DOE deputy asst. secretary of spent fuel and waste disposition Sam Brinton for another luggage theft, this time at Las Vegas’s Harry Reid airport. (cc: @EMPublications)

DOE spent fuel lead Brinton accused of second luggage theft.



by @BenjaminSWeiss, confirming today's reports with warrant from Las Vegas Metro PD.

Waste has been Emplaced! 🚮

We have finally begun emplacing defense-related transuranic (TRU) waste in Panel 8 of #WIPP.

Read more about the waste emplacement here: https://wipp.energy.gov/wipp_news_20221123-2.asp

Load More