RadWaste Monitor Vol. 12 No. 11
Visit Archives | Return to Issue
PDF
RadWaste Monitor
Article 9 of 9
March 15, 2019

Correction

By ExchangeMonitor

An article in the March 8 edition of RadWaste Monitor cited an incorrect figure for the estimated cost of a proposed deep geologic repository for low- and intermediate-level waste in Ontario, Canada. Ontario Power Generation’s projected life-cycle cost for the facility is $2.4 billion (CAN).

Comments are closed.

Partner Content
Social Feed

NEW: Via public records request, I’ve been able to confirm reporting today that a warrant has been issued for DOE deputy asst. secretary of spent fuel and waste disposition Sam Brinton for another luggage theft, this time at Las Vegas’s Harry Reid airport. (cc: @EMPublications)

DOE spent fuel lead Brinton accused of second luggage theft.



by @BenjaminSWeiss, confirming today's reports with warrant from Las Vegas Metro PD.

Waste has been Emplaced! 🚮

We have finally begun emplacing defense-related transuranic (TRU) waste in Panel 8 of #WIPP.

Read more about the waste emplacement here: https://wipp.energy.gov/wipp_news_20221123-2.asp

Load More