An article in the March 8 edition of RadWaste Monitor cited an incorrect figure for the estimated cost of a proposed deep geologic repository for low- and intermediate-level waste in Ontario, Canada. Ontario Power Generation’s projected life-cycle cost for the facility is $2.4 billion (CAN).
RadWaste Monitor Vol. 12 No. 11
Visit Archives | Return to Issue PDF
Visit Archives | Return to Issue PDF
RadWaste Monitor
Article 9 of 9
March 15, 2019
Correction
Partner Content
Jobs