RadWaste Monitor Vol. 13 No. 25
Visit Archives | Return to Issue
PDF
RadWaste Monitor
Article 9 of 9
June 18, 2020

Correction

By ExchangeMonitor

An article in the June 12 issue of RadWaste Monitor, “Army Corps Issues Sources-Sought Notice for Alaska Reactor Decommissioning,” should have said APTIM Federal Services’ engineering contract for utility segregation for the retired SM-1A nuclear reactor at Fort Greely, Alaska, is worth roughly $2 million.

Comments are closed.

Partner Content
Social Feed

NEW: Via public records request, I’ve been able to confirm reporting today that a warrant has been issued for DOE deputy asst. secretary of spent fuel and waste disposition Sam Brinton for another luggage theft, this time at Las Vegas’s Harry Reid airport. (cc: @EMPublications)

DOE spent fuel lead Brinton accused of second luggage theft.



by @BenjaminSWeiss, confirming today's reports with warrant from Las Vegas Metro PD.

Waste has been Emplaced! 🚮

We have finally begun emplacing defense-related transuranic (TRU) waste in Panel 8 of #WIPP.

Read more about the waste emplacement here: https://wipp.energy.gov/wipp_news_20221123-2.asp

Load More